The material and information contained on this website is for general information purposes only. ISA blog posts may be authored by ISA staff and guest authors from the automation community. Views and opinions expressed by a guest author are solely their own, and do not necessarily represent those of ISA. Posts made by guest authors have been subject to peer review.

All Posts

Tuning Control Loops Course: What Is a "Bump Test?"

This article was written  by Don Lovell, an automation consultant assisting customers in defining their automation road map to meet their business objectives.

 

Don Lovell Don Lovell

 

A customer had a poor performing loop in the brewery. The problem would really become an issue once in awhile depending on the operating conditions in the plant. The problem would be passed from person to person, shift to shift with no real answer.

In discussing the problem with a controls engineer, the engineer asked if an “open loop” bump test had been performed. The answer was no. Question: What is a bump test? A bump test was performed and initial tuning parameters were calculated and installed. The loop began to settle down.

An “open loop” bump test is performed by placing the loop in manual, making a step change in the manual output and observing or trending the result of the process variable. With the resultant process curve displayed, the process gain, dead time and process time constant can be determined. With these three pieces of information the technician can determine the initial tuning parameters by selecting among hundreds of tuning strategies. Strategies encompass the type of process, process characteristics and tuning objectives. Common or classical strategies include: Ziegler-Nichols, Cohen-Coon and Lambda.

The initial problem solving method is discussed in ISA, Troubleshooting: A Technicians Guide, 2nd Edition.

From page 65:

Consultation, also known as the “third head” technique, means that you and the equipment operator use a third person, perhaps someone from engineering or an outside consultant, with advanced knowledge about the system or the principles for troubleshooting the problem. This person may not solve the problem but may ask questions that make the cause apparent or spark fresh ideas for you. This process allows you to stand back during the discussions, which sometimes can help you distinguish the trees from forest.”

 


Related Posts

Ask the Automation Pros: The Use of Artificial Intelligence in Process Control

The following discussion is part of an occasional series, "Ask the Automation Pros," authored by Greg McM...
Greg McMillan Nov 12, 2024 4:30:00 PM

Protecting Electrical Terminal Blocks From Tampering

Electrical terminal blocks are a common sight in the automation world. Usually mounted on DIN rail in ind...
Anna Goncharova Nov 8, 2024 10:30:00 AM

How to Access ISA Technical Content

You Have Questions? ISA Has Answers. Serving up member-generated technical content related to standards, ...
Renee Bassett Nov 5, 2024 7:00:00 AM