The following tip is from the ISA book by Greg McMillan and Hunter Vegas titled 101 Tips for a Successful Automation Career, inspired by the ISA Mentor Program. This is Tip #21, and was written by Hunter.
At one time, I worked in a large continuous process plant that had alarms coming in constantly. The operators could hit the “Silence” button in their sleep. We had a case where a process flow was accidently diverted to the wrong tank, and it eventually filled and overflowed the tank. Even though the tank had redundant level transmitters and we had one of the more alert panelboard operators on shift, the rising level was not noticed until the tank overflowed and was noticed by a field operator. The panelboard operator had silenced two high alarms, two hi-hi alarms, two “over” alarms, and two range alarms over the course of two hours but had failed to recognize that there was a problem.
Concept: Enable alarms on instruments that matter and on process non-conformances that the operator can do something about. Having alarms for the sake of having alarms only ensures that ALL alarms will be ignored—even the ones that matter.
Details: Alarm management has become all the rage lately, and with good reason. The proliferation of instrumentation busses has provided access to a plethora of information, and because everything is now typically alarmed, the operators are being buried under a barrage of alarms. When faced with a constant stream of annunciation, most operators quickly become numb and increasingly just hit “Silence.” Critical alarms are lost in the noise and are routinely missed.
Ironically, there was an advantage to the relay annunciator panels built into the old control room panelboards. There were only so many points available, so only the critical alarms made the list. With the advent of computers, EVERYTHING can be alarmed, and unfortunately that is exactly what happens.
An engineer has several ways to address this problem, and many books have been written on the subject. Addressing this expansive topic in a few pages is not possible, but here is a brief list of suggestions that can help reduce the problem of too many alarms.
Watch-Outs: Many control systems default to having all the alarms enabled. On a new system, it may make more sense to enable none of the alarms initially and add them back as necessary.
Exceptions: Some plants do not allow the operators to suppress alarms because they are concerned that critical alarms will be turned off and never restored. One solution to this problem is to allow operators the ability to suppress alarms, but program the alarms to automatically restore after some appropriate period of time. In this way, a broken instrument can be silenced for a shift while repairs are made.
Insight: One plant only enabled setpoint alarms when a controller was in automatic. (Such alarms annunciate when the process variable is beyond the allowable range around the current setpoint.) High and low alarms were not enabled unless the controller was in manual. This method provided increased alarming when a loop was in manual but did not generate alarms on a point in automatic unless it deviated too far from setpoint.
Rule of Thumb: Alarm management is a never ending effort. Routinely review the plant’s alarm list, and try to eliminate or address points that appear too often. When configuring new systems, include some means of smart alarm management into the design.
About the Author
Gregory K. McMillan, CAP, is a retired Senior Fellow from Solutia/Monsanto where he worked in engineering technology on process control improvement. Greg was also an affiliate professor for Washington University in Saint Louis. Greg is an ISA Fellow and received the ISA Kermit Fischer Environmental Award for pH control in 1991, the Control magazine Engineer of the Year award for the process industry in 1994, was inducted into the Control magazine Process Automation Hall of Fame in 2001, was honored by InTech magazine in 2003 as one of the most influential innovators in automation, and received the ISA Life Achievement Award in 2010. Greg is the author of numerous books on process control, including Advances in Reactor Measurement and Control and Essentials of Modern Measurements and Final Elements in the Process Industry. Greg has been the monthly "Control Talk" columnist for Control magazine since 2002. Presently, Greg is a part time modeling and control consultant in Technology for Process Simulation for Emerson Automation Solutions specializing in the use of the virtual plant for exploring new opportunities. He spends most of his time writing, teaching and leading the ISA Mentor Program he founded in 2011.
Hunter Vegas, P.E., holds a B.S.E.E. degree from Tulane University and an M.B.A. from Wake Forest University. His job titles have included instrument engineer, production engineer, instrumentation group leader, principal automation engineer, and unit production manager. In 2001, he joined Avid Solutions, Inc., as an engineering manager and lead project engineer, where he works today. Hunter has executed nearly 2,000 instrumentation and control projects over his career, with budgets ranging from a few thousand to millions of dollars. He is proficient in field instrumentation sizing and selection, safety interlock design, electrical design, advanced control strategy, and numerous control system hardware and software platforms.